Design & build your school in ½ the time of traditional construction.

Occupy it 6 months earlier than traditional construction.

More than 85 school districts and 45 charter schools have benefited from accelerated construction by Modular Technology and have occupied their permanent steel frame, slab on grade campuses, classrooms, and gyms in only 6 – 8 months. Campuses as large as 127,000 square feet and classroom buildings as small as 4,000 square feet have seemingly appeared overnight. 75% complete buildings arrive at the site ready for finishes and connection to the infrastructure and the slab.

The full scope of Preconstruction Services is available to help the owner and architect achieve the most value during the design phase. Teamwork with the owner, architect, and consultants is our guiding principal. Our role is to assist with conceptual budgets & estimating, schedule development, constructability reviews, value engineering, material and equipment evaluation and selection, and providing a Guaranteed Maximum Price.

 

 

Transitioning to the Construction Phase, we move from a consultative role to the lead on the budget, schedule, subcontractors, quality, safety, and overall project management as the General Contractor while maintaining a collaborative team environment. Through both phases open communication and a straightforward approach to the design and building process provide the quality desired within the budget and timeframe. We approach the project as a partner with the owner, the architect, the municipalities, and the subcontractors.


School project links:

 

 

HOME    ABOUT US    PROJECT PROFILES    SERVICES    CONTACTS